
MEETING ROOM

WORKING SPACES
This is the project to transform an old factory management building into a new management office. First of all, because the existing structure was insufficient, we enlarged the building by building an additional building next to it with steel construction and again, without moving away from traditional building elements;



RECREATION AREA

ENTRANCE
HELP DESK



TYPE
WORKING AREA
LOCATION
GEBZE
LOT
620 M2
YEAR
2021
The cast mosaic stair coverings, concrete floors, arched transition areas and the bareness of the steel construction part of the additional structure formed the character of the building and the green-toned wall colors competing with the tile tones that warm all this coldness.





GROUND FLOOR
1 ENTRANCE HALL
2 STAIRS
3 ELEVATOR
4 RECEPTION
5 KITCHEN
6 WAITING AREA
7 WC
8 STAFF DRESSING ROOM
9 WC / SHOWERS
10 DRIVER'S ROOM
1ST FLOOR
1 FLOOR HALL
2 STAIRS
3 ELEVATOR
4 WC
5 OPEN OFFICES
6 ARCHIVE ROOM
7 SERVER ROOM
2ND FLOOR
1 FLOOR HALL
2 STAIRS
3 ELEVATOR
4 WC
5 ADMINISTRATOR ROOM
6 RECREATION ROOM
7 BATHROOMS
3RD FLOOR
1 FLOOR HALL
2 STAIRS
3 ELEVATOR
4 WC
5 ADMINISTRATOR ROOM
6 RECREATION ROOM
7 BATHROOM
8 WAITING ROOM BAR
9 WAITING ROOM
PENTHOUSE
1 RECREATION HALL
2 STAIRS
3 ELEVATOR
4 KITCHEN
5 TERRACE
Similar Projects

MEETING ROOM

This is the project to transform an old factory management building into a new management office. First of all, because the existing structure was insufficient, we enlarged the building by building an additional building next to it with steel construction and again, without moving away from traditional building elements;
WORKING SPACES



RECREATION AREA

ENTRANCE
HELP DESK



TYPE
WORKING AREA
LOCATION
GEBZE
LOT
620 M2
YEAR
2021
Similar Projects